CONSULTANTS Get a proposal
Aerial view of a large industrial construction site with cranes

Industrial plants and factories

Buildings designed around process equipment whose data often arrives late.

Industrial projects are built fast, around process equipment whose data often arrives late. Power demands, foundations and services change as the process design matures, and each change is a potential variation.

Gökhan Güney ran the electrical works at Baku Shipyard on the Contractor's side, and on the Engineer's side at an EV battery factory in Gemlik and a defence facility in Kırıkkale.

What we prepare

  • Process interface RFIs
  • Heavy power and substation submittals
  • Industrial MEP and utilities submittals
  • Variation notices for design changes
  • Fast-track programme updates
  • Commissioning and handover records

How we work on it

Changes recorded

Every late process data change is logged and notified.

Heavy power

Experience with large MV networks and substations.

Both sides

We have worked on FIDIC projects for the Contractor and for the Engineer.

When clients call us

Typical situations where this service saves time, money or entitlement.

  • Process equipment data changes after the building design is fixed.
  • Power demand has grown and the substation must be revised.
  • Design changes are not being notified as variations.
  • The plant must start production on a fixed date.

Questions

Do you work on EPC contracts?

Yes, including FIDIC Silver Book and Yellow Book contracts.

Can you support the owner's engineer?

Yes; our team has worked on the Engineer's side of FIDIC contracts and knows what the owner's engineer needs to see.

Lit building under construction with a crane at dusk

Need this on your project?

Send us the contract and a short note. We reply with a proposal.

No obligation. Tell us the contract and the problem; we tell you honestly whether we can help.

info@notaconsultants.com
Get a proposalSample documents