
Civil and structural
Concrete, formwork, earthworks, piling and steel structures.
- Concrete mix and rebar submittals
- Pour and formwork method statements
- Structural RFIs
Contract correspondence, technical submissions, programmes, reports and registers, plus specifications, contract health checks and bills of quantities.
It can be a full documentation package or a single critical submittal. At Nota every piece of work is reviewed by at least two specialists: one prepares it and the other checks it independently. Gaps and risks are found before the file reaches the other party.

Your remote project office. You share the contract, drawings, programme and correspondence; we prepare or review what has to be written, check it against the contract and hand it back ready to issue under your own letterhead, whichever party you represent.
Contractual correspondence between the project parties: notices of claim within the contractual time bar, variations, instructions and replies, backed by contemporary records.
Letters, Notices under 20.1 / 20.2, Variations, Claims
Material submittals with clause-by-clause compliance statements, method statements and ITPs written for the site conditions you describe, shop drawing transmittals, and RFIs that ask one clear question. For the Engineer, we review submittals and method statements against the specification and draft RFI responses.
Material submittals, Method statements, Transmittals, RFIs
Detailed work programmes and look-aheads, reviews of the Contractor's programme for the Engineer, and regular progress reports for any party.
Programmes, Progress reports, MS Project
Submittal, RFI and correspondence registers kept current, with every item tracked until it is closed.
Registers, Status tracking, Monthly summary
Civil, architectural, electrical and mechanical specifications written to the project standards, with clear materials, workmanship and testing requirements.
Particular specifications, Materials and workmanship, Testing requirements
An independent review of the contract documents: gaps, conflicts between conditions, specification and drawings, risky clauses and time bars, summarised in a clear report.
Third-party review, Risk register, Time-bar summary
Quantity take-off from the drawings and a structured bill of quantities for tender, valuation or variation pricing.
Quantity take-off, BOQ preparation, Variation pricing
Many RFIs and submittals sit where civil, architectural, electrical and mechanical work meet. We write and review them knowing what each discipline looks for.

Concrete, formwork, earthworks, piling and steel structures.

Finishes, façades, doors and hardware, waterproofing and fit-out.

MV/LV distribution, generators, UPS, lighting, fire alarm and ELV systems.

HVAC, plumbing and drainage, fire fighting and medical gases.
Switchgear, transformers, busbar trunking, UPS and generators: we read the type test reports and the single-line diagram before we write a word of the submittal.



We act as your project's document office month by month: correspondence, submittals, RFIs, reports and registers.
A defined set of documents, for example all method statements and material submittals for mobilisation or a new work package.
One urgent notice, submittal or method statement, prepared to your deadline.
We sign your NDA and agree the scope, timing and way of working.
We review the contracts, specifications, programmes and correspondence and identify the risks.
We prepare the documents. Every piece of work goes through a second technical check before it is delivered.
You issue under your own letterhead; we keep the registers and follow open items and documents until they are closed.
No. FIDIC is our specialism, but we work under any construction contract: public works, private and Employer-specific contracts, in Türkiye and abroad.
Not as a rule. We work remotely from what you share: contract, drawings, specification, programme, site photos and correspondence. Your team keeps control of the site; we take the paperwork off them. Only when it is needed, and as agreed with you, we attend important meetings on site.
Mainly the FIDIC 1999 and 2017 suites. We have also worked under U.S. government contracts (USACE).
Yes. You can start with one submittal or one notice and move to ongoing remote support later.
Any country. We work from Istanbul and support contractors wherever the project is, as long as the documents are in English or Turkish.
English and Turkish.

Send a short note about the project and we will propose a starting point.
No obligation. Tell us the contract and the problem; we tell you honestly whether we can help.
info@notaconsultants.com